Epoxy floors & line marking
Epoxy floors and line marking
We coat and line-mark floors in warehouses, car parks, garages and commercial spaces.
Since 2016 15 painters $20 million public liability 5.0 on Google

Floor work we do
Who it’s for: Warehouse operators, owners corporations with a car park, commercial site managers, and homeowners with a garage.
Paint system
- Floors
- Dulux protective coatings
- Commercial jobs
- Industrial ranges
- Epoxy floor coatings
- Line marking
- Protective floor coatings
- Pressure washing and surface prep
- After-hours and weekend work
Getting a floor coating right
Prep comes first
A floor coating is only as good as the prep under it. We clean and prepare the slab properly before anything goes down.
Line marking
Car park bays, walkways and loading areas marked out clearly once the coating is down.
The right floor system
We use Dulux protective floor coatings, matched to how the floor gets used.
How long it lasts
A properly applied protective coating usually lasts 10 to 15 years.
Questions about floor jobs
Anything else, give us a call on 0451 514 450.
Do you work after hours or on weekends?
Yes, whenever the job needs it.
How long will the job take?
It depends on the size of the job. You’ll get a timeframe with the quote, and we finish within it.
Do you do the preparation?
Yes. We do all the preparation and supply all the paint, materials and labour.
Other work we do
- Strata & apartment buildings
- New builds & developments
- Commercial painting
- Residential painting
- Roofs, industrial & protective coatings
- Heritage & restoration
- Epoxy floors & line marking (this page)
- Schools, aged care & government
We can add any of these to a job: colour consulting, minor repairs and plastering, pressure washing, scaffold and access hire, after-hours and weekend work.
Tell us about your next job
Send a few photos or your drawings through the quote form, or just give us a call. We’ll get back to you with a clear quote and a timeframe.




